Project Overview:

As part of the construction of the £205m Energy Recovery Facility (ERF) at the existing landfill and recycling site in Beddington, Sutton, Alltask were contracted to erect a roof structure over the temporary recycling plant. Early engagement from the client enabled our team to go over the proposed scheme. Our in-house design team value engineered a solution consisting of a traditional tube and fitting structure to support a HAKI 750 roof.

To assist civil works on-site Alltask also provided access solutions in the form of HAKI staircases, edge protection plus various tube and fitting structures during the course of the project. To provide access for overhead cabling, fans and extraction units we attached a working platform to the overhead crane thus creating a movable access solution for installation works saving valuable time and reducing our overall costs to the clients.

Back to all

Case Studies

© 2019 Alltask Ltd. Registered in England and Wales.

Company No. 02689988 VAT Registration No. 573 8265 11

Date of Incorporation: 21 February 1992

  • Facebook Social Icon
  • Instagram Social Icon
  • LinkedIn Social Icon