Project Overview:

Alltask inhouse scaffold design team provided ISG with a turn-key solution to build a temporary frame over the whole eastern block of the Mid-Kent College, Maidstone, Kent. We then encapsulated the structure in 1000 gauge polythene to prevent the spread of airborne fibres.

Alltask removed felt, bitumous weatherproofing, MMF Insulation, AIB boarding, asbestos cement hollow joists all to landfill in accordance with The Control of Asbestos Regulations 2012. Alltask supplied extraction to provide 10 air changes ph and allowed UKAS accredited labs to monitor and provide 4SCR.