CLIENT

PROJECT

LOCATION

DURATION

McNicholas

Potmans Lane Substation

East Sussex

6 Weeks

Project Overview:

Alltask were commissioned by Mc Nicholas to design erect and dismantle a scaffold to provide a weather protection enclosure at Ninfield Substation, the enclosure was designed to incorporate six new 132kV sealing end structures and included a NIKO runway beam to lift the new equipment into place installed and tested by Alltask trained operatives.

The structure was constructed from HAKI system scaffold with multiple decked levels to provide access for the cable jointing works and sealing end installation simultaneously, the structure was finished with shrink-wrap sheeting to ensure a weather proof enclosure by Alltask trained operatives and erected within tight deadlines during outages.

Back to all

Case Studies

© 2019 Alltask Ltd. Registered in England and Wales.

Company No. 02689988 VAT Registration No. 573 8265 11

Date of Incorporation: 21 February 1992

  • Facebook Social Icon
  • Instagram Social Icon
  • LinkedIn Social Icon