Erith Training College

Bespoke System Scaffolding Design
  • Entire Structure installed in 3 weeks without the use of cranes.
  • Bespoke in-house system scaffold design.
  • The entire structure was fixed into place by 100 fixed anchors and 30 steel cables.
  • 500m of HAKI 750mm beams were used in total.
  • A water management system was designed, supplied, and installed by Alltask.
  • Approximately 3600 square metres of HAKI cladding sheets were used to wrap the whole structure.
Industrial Scaffolding Temporary Roof
Scaffolding for Temporary Roof Erection
Service: Scaffolding Projects