Projects

A selection of our recent projects which showcase our range of services and skills.

Luton and Dunstable Hospital Alltask Scaffolding

Luton & Dunstable Hospital

As part of the NHS Bedfordshire Hospitals Site Redevelopment, KIER Construction undertook the construction of new clinical buildings at Luton & Dunstable Hospital. The project, aimed to deliver two interlinked concrete frame buildings with a total investment of £168 million, scheduled for completion by the end of 2024. Read more

Borough Market Trio of Projects

Trio of Central London Projects

Alltask is proud to have worked in collaboration with BAM UK & Ireland and PSD Prime Scaffold and Structural Designs Limited to complete these projects in Borough Market, Railway Approach, and Clink Street. Read more

Access Scaffolding Riverlinx CJV

Riverlinx CJV – Access Scaffolding

Riverlinx CJV, on behalf of Transport for London, are building a new twin-bore road tunnel under the Thames linking the Greenwich Peninsula to Newham. The road tunnel will be 1.4km long with two lanes in each direction. Read more

Wine Crafting Through Advanced Thermal Insulation

Thermal Insulation Wine Crafting

At Alltask, we take immense pride in contributing to the art of winemaking by optimising the fermentation process through advanced thermal insulation solutions. Linking Fermentation & Thermal Insulation: Wine enthusiasts often marvel at the delicate dance of seasons that imparts their favourite vintages with distinctive flavours. Read more

Paddington Station Scaffolding

Paddington Station

The project involves installing a waterproof Mega Tent, an overhead gantry crane, and steelwork for upgrades to the road above Platforms 11 and 12 to remove road support beams that are over 100 years old. Read more

Viaduct Road Access Scaffolding and Asbestos Removal

Viaduct Road in Chelmsford

Our recently completed beamed access scaffolding on Viaduct Road in Chelmsford, for our valued client J. Murphy & Sons Limited. This scaffolding was erected to provide high-level access for the installation of new services across the top of the viaduct, serving as the main power supply for Beaulieu Park Station. Read more

Asbestos Removal London Bridge

Railway Approach at London Bridge

Railway Approach (London Bridge) project successfully wrapped up for our valued client Bam Nuttall, as part of the CP6 framework. Our scaffold solution enabled safe asbestos removal that will be carried out internally by our asbestos team, followed by UHP blasting and precision paintwork. Read more

Waterloo Station Scaffolding

Waterloo Station PACE 2

Alltask’s scaffold design journey with Prime Scaffold and Structural Designs Limited (PSD) and our client, Octavius Infrastructure Ltd (OIL), began in PACE 2 in 2020 under an Early Contractor Involvement Contract (ECI). Read more

Ouse Valley Viaduct Restoration

Ouse Valley Viaduct

Alltask is providing ongoing support for our client, Octavius Infrastructure Ltd as part of their brick and stonework repair and restoration scheme to arches 3-8 of the Grade II listed Ouse Valley Viaduct, in Haywards Heath, West Sussex in a bid to revive the historic viaduct back to its former glory. Read more

Talk to us

Get in touch with a member of our team today to find out more about how we can help with your scaffolding, insulation, asbestos management, or environmental services project.

Scroll to top